Projects
Portfolio of Onshore North Projects
PIN OAK TERMINALS
- 431-acre petroleum liquids terminal
- Excavated, hauled, & installed over six (6) million cubic yards of embankment material, surcharge material, and secondary containment
- Installed site drainage
- Installed approximately 125,000 tons of 610 base material
- Installed 6,000 cy of concrete for tank ring foundations
- Installed foundations and erected pipe support structures
- Installed over 1.5 million yards of river sand for tank foundations and road beds
Bayou La Butte POWER Substation
- Stone Supply and Installation
- Hauling of Overburden
- Installation of Geotextile Fabric
- Refurbishment of existing road
- Final Site Grading
- 5,934 Man Hours
LNG Export Terminal
- 140,000 cy of excavation and embankment
- 177,000 cy of cement stabilization
- 540,000 sy of geogrid placement
- 384,000 tons of stone base placement
- 29,000 tons of scour stone placement
- 44,000 tons of splash stone placement
West-Central Texas SOLAR FACILITY
- 1,250 acre grassroot solar facility
- Clearing
- Grubbing
- Trucking
- Hauling
U.S. Army Corps of Engineers
- Excavating, loading, hauling, and installing 375,500 cy of materials
- Hauled and installed 75,500 tons of granular fill
- Responsible for the Installation of both vertical and horizontal wick drains
- Installed geotextile reinforcement
Marsh Terracing, Terrebonne Parish
- 10,300 lf of new terraces designed to stabilize the area and create additional marshland.
- Crews utilized our 350 Linkbelt Long reach excavators which were floating on deck barges to execute this project
- Crews also utilized our fleet of 320D – 52’ reach amphibious, marsh buggy excavators
DATA CENTER IN LOUISIANA
- Clearing
- Grubbing
- Excavation
- Grading
- Sitework for the switchyard associated with the Data Center